2019 Sodexo Feasibility Study on dangerous pitches at schools in Swindon with poor drainage.
2017 Vale of Glamorgan – Plassey Square Feasibility Report on SUDS drainage opportunity.
2016 Scottish and Southern Electricity, Boston Manor Sports Grounds – Feasibility report on the reinstatement of the sports grounds following significant civil engineering works on site.
2016 Chippenham Golf Club – Feasibility Study into fairway drainage on parts of the course rendered impassable by winter rainfall on 3 holes and members presentation.
2016 Royal Borough of Windsor and Maidenhead, Furze Platt School, Maidenhead – Feasibility Study on pitch drainage and improvement scheme.
2015 University College School Drainage Feasibility Report on large sports ground (3 cricket tables, 10 winter games pitches).
2015 Apredoc Polo – Feasibility of drainage of Stick and Ball polo pitch.
2015 St. Pauls School - Feasibility study on large sports field with three cricket tables and 6 winter games pitches.
2015 Swindon RFC – Feasibility Study and Specification for works - assessment of the current site constraints and proposals to improve the grounds and main pitch.
2014 Amey Construction - Northampton Girls School – Condition report and feasibility study on lawn landscaping.
2014 Wates Construction – Feasibility Study on sports ground restoration at Riverbank Primary 2015.
2014 Kingswood RFC – Condition report and Feasibility Study on the ground improvements and drainage.
2013 Hertsmere Borough Council - Feasibility Study toward optimisation of football pitch use at two large sites, Aycliffe Road and Furzefield.
2013 Uckfield Town Council – Feasibility study for drainage of the Ridgeway Sports Ground.
2013 Haddenham Parish Council – Feasibility into the creation of a cricket facility.
2013 Blackpool North Shore GC – Course condition and feasibility report with full range of recommendations and remedial strategic advice.
2012 Hackney Council – Emergency Feasibility Study and Specification for restoration works following the Radio 1 Big weekend Clearup Area: 35000m2 contract value: £115,000.
2012 Henley Golf Club – Feasibility report into the drainage or reconstruction of all the greens on the course.
2011 Stockwood Park Golf Club – Impact Assessment on Motorway Junction works including SWOT analysis and liaison with Golf Architects.
2011 Wolverhampton City Council – Barnhurst 10.5 Ha development Feasibility study.
2011 Hatchbrook Primary School - Feasibility Study to improve playing field drainage.
2010-11 Luton Borough Council – Luton Regional Sports Ground Development – An extensive and detailed survey into the redevelopment of the sports grounds at Luton Regional and Lothair facilities on a project value around £1.9million. The project started but was cut as a result of spending cuts in central government.
2010 Brighton University Feasibility study Sports ground drainage and improvement.
2010 Hackney Council - Hackney Marsh North – technical support and works supervision of large scale water main repairs to a depth of 9 metres and pitch reinstatement.
2009 – Putteridgebury, Luton – Feasibility study on greenfield site to create a cricket ground and winter pitches for nearby school. Project halted until 2015.
2009 New Becton Park, Newham Council – Feasibility study into draining a park with 3 football pitches.
2009 Luton Borough Council – Lee Manor School Feasibility Study.
2006 Milford Haven Golf Club – development of an outline Feasibility study and specification for draining or rebuilding 9No. golf greens which the club then proceeded to in-house installing USGA greens on the back 9 holes.